ATHARVA_UNIVERSITY_NODE_34

Prof. Amit Saxena

Information Technology
Atharva College of Engineering
Designation:Department Coordinator

Projects Guided

ACE / INFTactive

Origin Scale

Students are building a platform for campus operations.

ACE / INFTactive

Fusion Loop

Students are building a platform for nutrition tracking.

Builders roster
ACE / INFTactive

Guardian Loop

Students are building a platform for campus operations.

ACE / INFTactive

Insight Craft

Students are building a platform for learning analytics.

Builders roster
ACE / INFTactive

Fusion Dock

Students are building a platform for air quality monitoring.

Builders roster
ACE / CMPNactive

Eco Grid

Students are building a platform for energy monitoring.

Builders roster
ACE / CMPNactive

Nova Hub

Students are building a platform for agritech logistics.

ACE / CMPNactive

Prism Map

Students are building a platform for student wellness.

Builders roster
ACE / INFTactive

Crest Map

Students are building a platform for fraud detection.

ACE / INFTactive

Horizon Watch

Students are building a platform for urban mobility.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Crest Guard checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

17,700

Feedback Log

"Delta Wave checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

6,590

Feedback Log

"Bridge Grid checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

5,673

Feedback Log

"Delta Shift checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

9,063

Feedback Log

"Prism Map checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

17,909

Feedback Log

"Medi Watch checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

958

Feedback Log

"Vector Forge checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

2,958

Feedback Log

"Harbor Watch checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

11,395

Feedback Log

"Signal Sphere checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

14,433

Feedback Log

"Signal Vault checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

3,102

Feedback Log

"Matrix Track checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

10,460

Feedback Log

"Sage Point checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

14,454

Feedback Log

"Summit Track checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

18,942

Feedback Log

"Quantum Sphere checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

8,320

Feedback Log

"Motion Map checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

18,227

Feedback Log

"Trail Grid checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

850

Feedback Log

"Nimbus Point checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

8,693

Feedback Log

"Atlas Watch checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

1,756

Feedback Log

"Nova Map checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

2,927

Looking for more evaluations?

Browse More Projects