ATHARVA_UNIVERSITY_NODE_34
Venture Showcase

Atlas Watch

Problem Statement

Students are building a platform for agritech logistics.

Proposed Solution

The team is developing Atlas Watch to streamline the workflow with a simple, demo-ready experience.

Ecosystem Status

active Development

Technical Domains

Internet of Things

Hosting Department

Computer Engineering (ACE)

Capital Allocated

27,904 INR

Funding State

Funded Venture

Evaluation History

Friday #29

November 20, 2026

+ ₹9,707

"Atlas Watch checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Friday #27

November 6, 2026

+ ₹16,441

"Atlas Watch checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Friday #2

May 15, 2026

+ ₹1,756

"Atlas Watch checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Witnessed the execution?

Back to Showcase