ATHARVA_UNIVERSITY_NODE_34
Venture Showcase
Atlas Watch
Problem Statement
Students are building a platform for agritech logistics.
Proposed Solution
The team is developing Atlas Watch to streamline the workflow with a simple, demo-ready experience.
Ecosystem Status
active Development
Technical Domains
Internet of Things
Hosting Department
Computer Engineering (ACE)
Capital Allocated
27,904 INR
Funding State
Funded VentureEvaluation History
Friday #29
November 20, 2026
+ ₹9,707
"Atlas Watch checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."
Friday #27
November 6, 2026
+ ₹16,441
"Atlas Watch checkpoint 1: validated the core user flow and confirmed the first prototype on staging."
Friday #2
May 15, 2026
+ ₹1,756
"Atlas Watch checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

