ATHARVA_UNIVERSITY_NODE_34

Dr. Seema Reddy

Computer Engineering
Atharva College of Engineering
Designation:Professor

Projects Guided

ACE / INFTactive

Nexus Pulse

Students are building a platform for smart mobility.

Builders roster
ACE / CMPNactive

Campus Scale

Students are building a platform for skill discovery.

ACE / INFTactive

Orbit Point

Students are building a platform for urban mobility.

ACE / CMPNactive

Zenith Path

Students are building a platform for agritech logistics.

ACE / CMPNactive

Nova Edge

Students are building a platform for disaster response.

Builders roster
ACE / CMPNactive

Crest Edge

Students are building a platform for water conservation.

Builders roster
ACE / CMPNactive

Lumen Frame

Students are building a platform for local commerce.

ACE / CMPNactive

Insight Frame

Students are building a platform for skill discovery.

Builders roster
ACE / INFTactive

Orion Dock

Students are building a platform for fraud detection.

ACE / CMPNactive

Lumen Link

Students are building a platform for energy monitoring.

ACE / INFTactive

Cipher Nest

Students are building a platform for air quality monitoring.

Builders roster
ACE / CMPNactive

Guardian Map

Students are building a platform for water conservation.

ACE / CMPNactive

Pulse Forge

Students are building a platform for supply chain visibility.

Builders roster
ACE / INFTactive

Trail Shift

Students are building a platform for campus operations.

Reviews Moderated (Panel Head)

Feedback Log

"Motion Path checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

824

Feedback Log

"Atlas Sense checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

14,068

Feedback Log

"Astra Hub checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

18,474

Feedback Log

"Eco Pilot checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

6,506

Feedback Log

"Vector Map checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

13,081

Feedback Log

"Nimbus Desk checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

10,450

Feedback Log

"Vertex Flow checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

1,928
Friday #20 Details

September 18, 2026

Eco Pilot

Feedback Log

"Eco Pilot checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

2,031

Feedback Log

"Cipher Pilot checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

8,128

Feedback Log

"Summit Watch checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

14,067

Feedback Log

"Horizon Vault checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

2,109

Feedback Log

"Zenith Nest checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

12,677

Feedback Log

"Guardian Link checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

19,559

Looking for more evaluations?

Browse More Projects