ATHARVA_UNIVERSITY_NODE_34
Venture Showcase
Summit Watch
Problem Statement
Students are building a platform for local commerce.
Proposed Solution
The team is developing Summit Watch to streamline the workflow with a simple, demo-ready experience.
Ecosystem Status
active Development
Technical Domains
Blockchain Technology
Hosting Department
Computer Engineering (ACE)
Capital Allocated
28,278 INR
Funding State
Funded VentureProject Guides
Evaluation History
Friday #16
August 21, 2026
+ ₹3,432
"Summit Watch checkpoint 2: tightened the data model and started performance profiling for the next sprint."
Friday #15
August 14, 2026
+ ₹14,067
"Summit Watch checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."
Friday #6
June 12, 2026
+ ₹10,779
"Summit Watch checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

