ATHARVA_UNIVERSITY_NODE_34

Prof. Amit Nair

Information Technology
Atharva College of Engineering
Designation:Associate Professor

Projects Guided

ACE / CMPNactive

Prism Guard

Students are building a platform for water conservation.

ACE / CMPNactive

Nova Scale

Students are building a platform for energy monitoring.

ACE / INFTactive

Sage Wave

Students are building a platform for nutrition tracking.

Builders roster
ACE / CMPNactive

Vertex Craft

Students are building a platform for agritech logistics.

Builders roster
ACE / INFTactive

Orbit Route

Students are building a platform for smart mobility.

ACE / CMPNactive

Zenith Spark

Students are building a platform for disaster response.

Builders roster
ACE / INFTactive

Orion Link

Students are building a platform for fraud detection.

ACE / CMPNactive

Insight Sphere

Students are building a platform for water conservation.

Builders roster
ACE / INFTactive

Astra Sense

Students are building a platform for digital health.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Harbor Track checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

702

Feedback Log

"Compass Care checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

16,949

Feedback Log

"Eco Nest checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

9,595

Feedback Log

"Beacon Scale checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

14,753

Feedback Log

"Motion Track checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,368

Feedback Log

"Medi Nest checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

16,726

Feedback Log

"Quantum Loop checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

15,712

Feedback Log

"Cipher Chain checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

14,552

Feedback Log

"Signal Point checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

1,225

Feedback Log

"Cloud Wave checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

16,780

Feedback Log

"Astra Forge checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

5,896

Feedback Log

"Campus Nest checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

13,388

Feedback Log

"Compass Forge checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

11,058

Feedback Log

"Astra Guard checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,465

Feedback Log

"Nexus Vault checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

9,367

Feedback Log

"Quantum Link checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

1,058

Feedback Log

"Flux Forge checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,108

Looking for more evaluations?

Browse More Projects