ATHARVA_UNIVERSITY_NODE_34
Venture Showcase
Beacon Scale
Problem Statement
Students are building a platform for agritech logistics.
Proposed Solution
The team is developing Beacon Scale to streamline the workflow with a simple, demo-ready experience.
Ecosystem Status
active Development
Technical Domains
Internet of Things
Hosting Department
Computer Engineering (ACE)
Capital Allocated
19,961 INR
Funding State
Funded VentureProject Guides
Evaluation History
Friday #30
November 27, 2026
+ ₹2,601
"Beacon Scale checkpoint 3: validated the core user flow and confirmed the first prototype on staging."
Friday #27
November 6, 2026
+ ₹14,753
"Beacon Scale checkpoint 2: finished the first hardware/software sync and captured demo evidence."
Friday #3
May 22, 2026
+ ₹2,607
"Beacon Scale checkpoint 1: finished the first hardware/software sync and captured demo evidence."

