ATHARVA_UNIVERSITY_NODE_34

Prof. Sunita Patil

Information Technology
Atharva College of Engineering
Designation:Assistant Professor

Projects Guided

ACE / INFTactive

Beacon Guard

Students are building a platform for urban mobility.

Builders roster
ACE / CMPNactive

Crest Loop

Students are building a platform for local commerce.

ACE / CMPNactive

Flux Desk

Students are building a platform for disaster response.

ACE / INFTactive

Matrix Craft

Students are building a platform for digital health.

Builders roster
ACE / CMPNactive

Medi Edge

Students are building a platform for student wellness.

Builders roster
ACE / INFTactive

MediVision AI

Radiologists encounter elevated error rates in identifying hairline fractures.

Builders roster
ACE / CMPNactive

Orbit Sense

Students are building a platform for skill discovery.

Builders roster
ACE / INFTactive

Eco Shift

Students are building a platform for digital health.

Reviews Moderated (Panel Head)

Feedback Log

"Sage Nest checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

2,188

Feedback Log

"Vector Vault checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

18,178

Feedback Log

"Signal Lens checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

4,460

Feedback Log

"Atlas Watch checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

16,441

Feedback Log

"Motion Link checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

11,687

Feedback Log

"Flux Link checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

17,599

Feedback Log

"Crest Forge checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

3,711

Feedback Log

"Fusion Sphere checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

12,469

Feedback Log

"Compass Sphere checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

3,278

Feedback Log

"Cloud Desk checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

15,445

Feedback Log

"Sage Watch checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

5,184

Feedback Log

"Prism Hub checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

6,259

Feedback Log

"Nimbus Link checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

2,476

Feedback Log

"Cipher Watch checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

4,290

Feedback Log

"Atlas Care checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

1,270

Feedback Log

"Nimbus Track checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

13,338

Feedback Log

"Harbor Care checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

3,157

Feedback Log

"Harbor Vault checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

13,114

Feedback Log

"Lumen Watch checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

19,129

Feedback Log

"Cipher Watch checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

13,230

Feedback Log

"Showcased React interface linked to python backend. Model loaded and run successfully."

Looking for more evaluations?

Browse More Projects