ATHARVA_UNIVERSITY_NODE_34
Venture Showcase
Zenith Loop
Problem Statement
Students are building a platform for campus operations.
Proposed Solution
The team is developing Zenith Loop to streamline the workflow with a simple, demo-ready experience.
Ecosystem Status
active Development
Technical Domains
Internet of Things
Hosting Department
Information Technology (ACE)
Capital Allocated
24,304 INR
Funding State
Funded VentureProject Guides
Evaluation History
Friday #32
December 11, 2026
+ ₹3,164
"Zenith Loop checkpoint 3: improved the UI polish and resolved a set of edge-case defects."
Friday #30
November 27, 2026
+ ₹7,912
"Zenith Loop checkpoint 1: finished the first hardware/software sync and captured demo evidence."
Friday #26
October 30, 2026
+ ₹13,228
"Zenith Loop checkpoint 2: tightened the data model and started performance profiling for the next sprint."

