ATHARVA_UNIVERSITY_NODE_34
Venture Showcase
Lumen Shift
Problem Statement
Students are building a platform for energy monitoring.
Proposed Solution
The team is developing Lumen Shift to streamline the workflow with a simple, demo-ready experience.
Ecosystem Status
active Development
Technical Domains
Internet of Things
Hosting Department
Computer Engineering (ACE)
Capital Allocated
48,712 INR
Funding State
Funded VentureProject Guides
Evaluation History
Friday #25
October 23, 2026
+ ₹19,536
"Lumen Shift checkpoint 3: tightened the data model and started performance profiling for the next sprint."
Friday #9
July 3, 2026
+ ₹18,248
"Lumen Shift checkpoint 2: finished the first hardware/software sync and captured demo evidence."
Friday #3
May 22, 2026
+ ₹10,928
"Lumen Shift checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

