ATHARVA_UNIVERSITY_NODE_34

Prof. Amit Reddy

Information Technology
Atharva College of Engineering
Designation:Department Coordinator

Projects Guided

ACE / INFTactive

Cipher Pulse

Students are building a platform for digital health.

Builders roster
ACE / INFTactive

Fusion Pulse

Students are building a platform for learning analytics.

ACE / INFTactive

Beacon Wave

Students are building a platform for air quality monitoring.

Builders roster
ACE / CMPNactive

Vertex Point

Students are building a platform for student wellness.

Builders roster
ACE / CMPNactive

Sage Core

Students are building a platform for student wellness.

Builders roster
ACE / INFTactive

Horizon Core

Students are building a platform for digital health.

Builders roster
ACE / CMPNactive

Trail Route

Students are building a platform for student wellness.

Builders roster
ACE / CMPNactive

Prism Vault

Students are building a platform for agritech logistics.

ACE / CMPNactive

Nova Flow

Students are building a platform for local commerce.

Builders roster
ACE / INFTactive

Medi Forge

Students are building a platform for digital health.

ACE / INFTactive

Nova Chain

Students are building a platform for nutrition tracking.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Pulse Guard checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

5,121

Feedback Log

"Zenith Watch checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

3,441

Feedback Log

"Guardian Flow checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

13,524

Feedback Log

"Medi Sense checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

14,276

Feedback Log

"Bridge Lens checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

15,227

Feedback Log

"Summit Shift checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,679

Feedback Log

"Medi Track checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

14,641

Feedback Log

"Zenith Shift checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

18,940

Feedback Log

"Harbor Chain checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

16,520

Feedback Log

"Vector Hub checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

1,076

Feedback Log

"Orion Pulse checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

4,580

Feedback Log

"Nexus Grid checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

12,580

Feedback Log

"Origin Scale checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

4,303

Feedback Log

"Astra Watch checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

1,957

Feedback Log

"Campus Loop checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

6,248

Feedback Log

"Flux Pilot checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

6,964

Looking for more evaluations?

Browse More Projects