ATHARVA_UNIVERSITY_NODE_34

Prof. Sameer Mehta

Information Technology
Atharva College of Engineering
Designation:Associate Professor

Projects Guided

ACE / INFTactive

Guardian Pulse

Students are building a platform for nutrition tracking.

ACE / CMPNactive

Horizon Wave

Students are building a platform for student wellness.

ACE / INFTactive

Nimbus Frame

Students are building a platform for campus operations.

Builders roster
ACE / INFTactive

Cipher Frame

Students are building a platform for smart mobility.

Builders roster
ACE / CMPNactive

Fusion Spark

Students are building a platform for water conservation.

Builders roster
ACE / CMPNactive

Insight Link

Students are building a platform for student wellness.

ACE / CMPNactive

Beacon Hub

Students are building a platform for water conservation.

ACE / CMPNactive

Fusion Pilot

Students are building a platform for student wellness.

ACE / CMPNactive

Signal Pilot

Students are building a platform for skill discovery.

Builders roster
ACE / INFTactive

Pulse Nest

Students are building a platform for fraud detection.

Builders roster
ACE / CMPNactive

Harbor Nest

Students are building a platform for agritech logistics.

ACE / CMPNactive

Orbit Shift

Students are building a platform for student wellness.

ACE / INFTactive

Cloud Works

Students are building a platform for nutrition tracking.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Eco Path checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

16,876

Feedback Log

"Delta Works checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

2,125

Feedback Log

"Orbit Path checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

17,505

Feedback Log

"Fusion Scale checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

11,001

Feedback Log

"Eco Pulse checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

15,157

Feedback Log

"Quantum Grid checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

13,146

Feedback Log

"Crest Watch checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

5,423

Feedback Log

"Orion Chain checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

18,800

Feedback Log

"Quantum Path checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

9,718

Feedback Log

"Cloud Pulse checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

11,652

Feedback Log

"Delta Lens checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

5,358

Feedback Log

"Orion Sphere checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

3,881

Feedback Log

"Beacon Map checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

13,046

Feedback Log

"Insight Map checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

19,421

Feedback Log

"Orion Care checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

1,948

Looking for more evaluations?

Browse More Projects