ATHARVA_UNIVERSITY_NODE_34

Prof. Rahul Patil

Information Technology
Atharva College of Engineering
Designation:Associate Professor

Projects Guided

ACE / CMPNactive

Eco Wave

Students are building a platform for water conservation.

Builders roster
ACE / CMPNactive

Origin Point

Students are building a platform for energy monitoring.

Builders roster
ACE / INFTactive

Vector Loop

Students are building a platform for smart mobility.

Builders roster
ACE / INFTactive

Signal Desk

Students are building a platform for digital health.

ACE / INFTactive

Vector Frame

Students are building a platform for urban mobility.

ACE / INFTactive

Insight Grid

Students are building a platform for campus operations.

ACE / INFTactive

Zenith Hub

Students are building a platform for campus operations.

ACE / CMPNactive

Zenith Map

Students are building a platform for water conservation.

ACE / CMPNactive

Cloud Watch

Students are building a platform for supply chain visibility.

ACE / CMPNactive

Flux Sense

Students are building a platform for student wellness.

ACE / INFTactive

Prism Shift

Students are building a platform for urban mobility.

ACE / CMPNactive

Nimbus Works

Students are building a platform for agritech logistics.

Builders roster
ACE / INFTactive

Beacon Works

Students are building a platform for campus operations.

Reviews Moderated (Panel Head)

Feedback Log

"Harbor Grid checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

5,040

Feedback Log

"Trail Care checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

13,109

Feedback Log

"Prism Sense checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

18,096

Feedback Log

"Zenith Hub checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

14,893

Feedback Log

"Matrix Nest checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

8,234

Feedback Log

"Cipher Path checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

16,824

Feedback Log

"Flux Lens checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

16,431

Feedback Log

"Nova Hub checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

8,653

Feedback Log

"Matrix Hub checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

16,783

Feedback Log

"Lumen Vault checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

12,934

Feedback Log

"Orion Point checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

17,717

Feedback Log

"Bridge Care checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

18,420

Feedback Log

"Vector Forge checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

5,597

Feedback Log

"Nimbus Care checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

10,604

Feedback Log

"Crest Works checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

10,987

Feedback Log

"Guardian Care checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

7,605

Feedback Log

"Astra Map checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

5,782

Feedback Log

"Lumen Grid checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

14,066

Looking for more evaluations?

Browse More Projects