ATHARVA_UNIVERSITY_NODE_34

Prof. Rahul Joshi

Information Technology
Atharva College of Engineering
Designation:Industry Mentor

Projects Guided

ACE / INFTactive

Cloud Wave

Students are building a platform for urban mobility.

Builders roster
ACE / INFTactive

Matrix Point

Students are building a platform for learning analytics.

Builders roster
ACE / INFTactive

Nexus Loop

Students are building a platform for digital health.

Builders roster
ACE / INFTactive

Signal Core

Students are building a platform for nutrition tracking.

ACE / CMPNactive

Cipher Craft

Students are building a platform for supply chain visibility.

Builders roster
ACE / INFTactive

Sage Craft

Students are building a platform for campus operations.

ACE / INFTactive

Prism Edge

Students are building a platform for digital health.

Builders roster
ACE / CMPNactive

Matrix Lens

Students are building a platform for supply chain visibility.

ACE / CMPNactive

Orbit Lens

Students are building a platform for energy monitoring.

Builders roster
ACE / CMPNactive

Sage Lens

Students are building a platform for disaster response.

Builders roster
ACE / CMPNactive

Origin Track

Students are building a platform for energy monitoring.

Builders roster
ACE / INFTactive

Origin Hub

Students are building a platform for urban mobility.

Reviews Moderated (Panel Head)

Feedback Log

"Pulse Watch checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

13,557

Feedback Log

"Fusion Track checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

480

Feedback Log

"Vertex Care checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

3,903

Feedback Log

"Insight Core checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

9,632

Feedback Log

"Summit Point checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

15,127

Feedback Log

"Zenith Path checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

16,042

Feedback Log

"Crest Vault checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

14,078

Feedback Log

"Crest Pilot checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

11,793

Feedback Log

"Orbit Hub checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

14,949

Feedback Log

"Crest Nest checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

12,056

Feedback Log

"Insight Chain checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

13,055

Feedback Log

"Cipher Nest checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

3,618

Feedback Log

"Delta Hub checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

4,282

Looking for more evaluations?

Browse More Projects