ATHARVA_UNIVERSITY_NODE_34

Prof. Sunita Iyer

Information Technology
Atharva College of Engineering
Designation:Industry Mentor

Projects Guided

ACE / CMPNactive

Vector Guard

Students are building a platform for supply chain visibility.

Builders roster
ACE / CMPNactive

Pulse Wave

Students are building a platform for energy monitoring.

Builders roster
ACE / CMPNactive

Medi Core

Students are building a platform for disaster response.

Builders roster
ACE / CMPNactive

Horizon Point

Students are building a platform for skill discovery.

ACE / INFTactive

Insight Wave

Students are building a platform for fraud detection.

ACE / INFTactive

Orbit Craft

Students are building a platform for learning analytics.

Builders roster
ACE / INFTactive

Trail Edge

Students are building a platform for nutrition tracking.

Builders roster
ACE / CMPNactive

Nova Link

Students are building a platform for student wellness.

Builders roster
ACE / INFTactive

Medi Vault

Students are building a platform for urban mobility.

ACE / INFTactive

Delta Flow

Students are building a platform for urban mobility.

Builders roster
ACE / CMPNactive

Pulse Grid

Students are building a platform for student wellness.

ACE / INFTactive

Crest Care

Students are building a platform for urban mobility.

ACE / CMPNactive

Signal Forge

Students are building a platform for energy monitoring.

ACE / CMPNactive

Nimbus Chain

Students are building a platform for energy monitoring.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Prism Flow checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

1,161

Feedback Log

"Crest Track checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

12,416

Feedback Log

"Nova Lens checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

7,974

Feedback Log

"Bridge Care checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

9,784

Feedback Log

"Pulse Desk checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

3,320

Feedback Log

"Cipher Shift checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,892

Feedback Log

"Nova Link checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

1,982

Feedback Log

"Crest Works checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

11,069

Feedback Log

"Nimbus Loop checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

9,294

Feedback Log

"Orbit Track checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

13,770

Feedback Log

"Sage Watch checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

11,816

Feedback Log

"Campus Sphere checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

10,050

Feedback Log

"Cloud Point checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

848

Feedback Log

"Flux Link checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

801

Feedback Log

"Astra Lens checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

17,517

Looking for more evaluations?

Browse More Projects