ATHARVA_UNIVERSITY_NODE_34

Dr. Kavita Patil

Computer Engineering
Atharva College of Engineering
Designation:Assistant Professor

Projects Guided

ACE / CMPNactive

Astra Guard

Students are building a platform for agritech logistics.

ACE / INFTactive

Quantum Point

Students are building a platform for smart mobility.

ACE / CMPNactive

Campus Flow

Students are building a platform for disaster response.

ACE / CMPNactive

Motion Flow

Students are building a platform for student wellness.

Builders roster
ACE / INFTactive

Crest Grid

Students are building a platform for nutrition tracking.

ACE / INFTactive

Vertex Pulse

Students are building a platform for smart mobility.

ACE / CMPNactive

Campus Watch

Students are building a platform for agritech logistics.

Builders roster
ACE / CMPNactive

Zenith Works

Students are building a platform for skill discovery.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Campus Vault checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,659

Feedback Log

"Harbor Pulse checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

15,108

Feedback Log

"Bridge Map checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

330

Feedback Log

"Summit Chain checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

13,313

Feedback Log

"Signal Wave checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

14,283

Feedback Log

"Crest Path checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

2,914

Feedback Log

"Vector Guard checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

8,063

Feedback Log

"Compass Path checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,400

Feedback Log

"Horizon Pilot checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

17,520

Feedback Log

"Signal Sphere checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

8,264

Feedback Log

"Cipher Shift checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

1,127

Feedback Log

"Orbit Flow checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

8,088

Feedback Log

"Orbit Works checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

2,626

Feedback Log

"Matrix Loop checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

16,666

Feedback Log

"Vector Sense checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

3,562

Feedback Log

"Campus Guard checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

14,265

Feedback Log

"Flux Sphere checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

2,899

Feedback Log

"Matrix Chain checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

6,461

Feedback Log

"Vector Pilot checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

9,257

Feedback Log

"Nimbus Flow checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

256

Feedback Log

"Motion Care checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,705

Looking for more evaluations?

Browse More Projects