ATHARVA_UNIVERSITY_NODE_34

Dr. Anjali Kumar

Computer Engineering
Atharva College of Engineering
Designation:Assistant Professor

Projects Guided

ACE / CMPNactive

Origin Guard

Students are building a platform for local commerce.

ACE / INFTactive

Summit Guard

Students are building a platform for air quality monitoring.

Builders roster
ACE / INFTactive

Orbit Guard

Students are building a platform for campus operations.

ACE / INFTactive

Harbor Pilot

Students are building a platform for campus operations.

Builders roster
ACE / CMPNactive

Sage Watch

Students are building a platform for energy monitoring.

ACE / CMPNactive

Prism Forge

Students are building a platform for local commerce.

Builders roster
ACE / CMPNactive

Lumen Sense

Students are building a platform for local commerce.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Campus Path checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

18,183

Feedback Log

"Compass Wave checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

288

Feedback Log

"Crest Works checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,023

Feedback Log

"Prism Works checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

11,033

Feedback Log

"Horizon Shift checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

8,563

Feedback Log

"Trail Map checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

1,482

Feedback Log

"Signal Map checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

7,271

Feedback Log

"Nimbus Chain checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

12,569

Feedback Log

"Summit Works checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

3,834

Feedback Log

"Prism Vault checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

11,842

Feedback Log

"Bridge Link checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

12,022

Feedback Log

"Bridge Hub checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

5,693

Feedback Log

"Sage Works checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

16,454

Feedback Log

"Beacon Vault checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,602

Feedback Log

"Sage Lens checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

17,664

Feedback Log

"Cloud Map checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

11,492

Looking for more evaluations?

Browse More Projects