ATHARVA_UNIVERSITY_NODE_34

Dr. Priya Nair

Computer Engineering
Atharva College of Engineering
Designation:Professor

Projects Guided

ACE / INFTactive

Summit Point

Students are building a platform for learning analytics.

Builders roster
ACE / INFTactive

Prism Loop

Students are building a platform for learning analytics.

Builders roster
ACE / CMPNactive

Compass Core

Students are building a platform for local commerce.

ACE / INFTactive

Origin Core

Students are building a platform for fraud detection.

Builders roster
ACE / CMPNactive

Sage Flow

Students are building a platform for supply chain visibility.

Builders roster
ACE / CMPNactive

Cloud Pulse

Students are building a platform for student wellness.

ACE / INFTactive

Lumen Map

Students are building a platform for nutrition tracking.

Builders roster
ACE / INFTactive

Flux Chain

Students are building a platform for digital health.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Guardian Care checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

16,838

Feedback Log

"Trail Hub checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,144

Feedback Log

"Nexus Loop checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

3,529

Feedback Log

"Signal Loop checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

15,857

Feedback Log

"Campus Loop checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

18,331

Feedback Log

"Bridge Flow checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

1,142

Feedback Log

"Sage Chain checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

10,220

Feedback Log

"Cipher Core checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

11,509

Feedback Log

"Horizon Loop checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

8,142

Feedback Log

"Pulse Grid checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

19,521

Feedback Log

"Summit Pulse checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

12,058

Feedback Log

"Cipher Sphere checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

15,513

Feedback Log

"Motion Sense checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

11,732

Feedback Log

"Nexus Sphere checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

17,649

Looking for more evaluations?

Browse More Projects