ATHARVA_UNIVERSITY_NODE_34

Dr. Anjali Saxena

Computer Engineering
Atharva College of Engineering
Designation:Professor

Projects Guided

ACE / CMPNactive

Nexus Wave

Students are building a platform for local commerce.

ACE / CMPNactive

Orbit Edge

Students are building a platform for disaster response.

ACE / INFTactive

Bridge Frame

Students are building a platform for nutrition tracking.

Builders roster
ACE / INFTcompleted

Red dead redemption 3

the best game ever is taking too much time so we stepped in

ACE / INFTactive

Quantum Grid

Students are building a platform for learning analytics.

ACE / CMPNactive

Fusion Grid

Students are building a platform for disaster response.

Builders roster
ACE / CMPNactive

Nova Sphere

Students are building a platform for water conservation.

ACE / CMPNactive

Quantum Sphere

Students are building a platform for student wellness.

ACE / CMPNactive

Lumen Nest

Students are building a platform for skill discovery.

Builders roster
ACE / CMPNactive

Medi Shift

Students are building a platform for energy monitoring.

ACE / CMPNactive

Quantum Shift

Students are building a platform for water conservation.

Builders roster
ACE / CMPNactive

Summit Shift

Students are building a platform for agritech logistics.

Reviews Moderated (Panel Head)

Feedback Log

"Cipher Forge checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

15,907

Feedback Log

"Delta Shift checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

486

Feedback Log

"Flux Watch checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

3,737

Feedback Log

"Motion Hub checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,052

Feedback Log

"Origin Path checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

15,695

Feedback Log

"Summit Core checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

16,263

Feedback Log

"Lumen Chain checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

556

Feedback Log

"Bridge Sense checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

19,106

Feedback Log

"Harbor Point checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

6,379

Feedback Log

"Atlas Hub checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

18,939

Feedback Log

"Medi Sphere checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

2,547

Feedback Log

"Cloud Care checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

19,710

Feedback Log

"Zenith Track checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

9,541

Feedback Log

"Vector Lens checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,809

Feedback Log

"Sage Hub checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

1,502

Feedback Log

"Nova Watch checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

5,388

Feedback Log

"Sage Vault checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

12,552

Looking for more evaluations?

Browse More Projects