ATHARVA_UNIVERSITY_NODE_34

Dr. Anjali Nair

Computer Engineering
Atharva College of Engineering
Designation:Assistant Professor

Projects Guided

ACE / INFTactive

Harbor Guard

Students are building a platform for nutrition tracking.

Builders roster
ACE / CMPNactive

Insight Scale

Students are building a platform for energy monitoring.

ACE / INFTactive

Guardian Core

Students are building a platform for urban mobility.

ACE / INFTactive

Summit Path

Students are building a platform for nutrition tracking.

Builders roster
ACE / INFTactive

Atlas Path

Students are building a platform for campus operations.

ACE / INFTactive

Eco Edge

Students are building a platform for smart mobility.

Builders roster
ACE / INFTactive

Bridge Edge

Students are building a platform for smart mobility.

Builders roster
ACE / CMPNactive

Flux Flow

Students are building a platform for energy monitoring.

Builders roster
ACE / INFTactive

Nova Track

Students are building a platform for urban mobility.

Builders roster
ACE / INFTactive

Guardian Hub

Students are building a platform for campus operations.

ACE / CMPNactive

Campus Sphere

Students are building a platform for local commerce.

Builders roster
ACE / CMPNactive

Trail Care

Students are building a platform for disaster response.

Builders roster
ACE / INFTactive

Nexus Sense

Students are building a platform for air quality monitoring.

Builders roster
ACE / CMPNactive

Insight Sense

Students are building a platform for skill discovery.

Builders roster
ACE / INFTactive

Insight Works

Students are building a platform for digital health.

Reviews Moderated (Panel Head)

Feedback Log

"Delta Path checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

461

Feedback Log

"Zenith Sphere checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

8,976

Feedback Log

"Summit Scale checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

4,815

Feedback Log

"Beacon Flow checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

6,430

Feedback Log

"Quantum Sense checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

19,475

Feedback Log

"Bridge Flow checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

14,203

Feedback Log

"Flux Watch checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

17,894

Feedback Log

"Vertex Core checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

9,372

Feedback Log

"Sage Track checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

3,960

Feedback Log

"Sage Guard checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

17,797

Feedback Log

"Orbit Grid checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,533

Feedback Log

"Prism Sphere checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

13,807

Feedback Log

"Trail Forge checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

11,161

Feedback Log

"Summit Hub checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

462

Feedback Log

"Pulse Care checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

6,705

Feedback Log

"Pulse Shift checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

3,786

Feedback Log

"Flux Guard checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

3,995

Feedback Log

"Lumen Watch checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

19,952

Feedback Log

"Matrix Link checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

19,074

Looking for more evaluations?

Browse More Projects