ATHARVA_UNIVERSITY_NODE_34

Prof. Sameer Kumar

Information Technology
Atharva College of Engineering
Designation:Department Coordinator

Projects Guided

ACE / CMPNactive

Crest Desk

Students are building a platform for agritech logistics.

Builders roster
ACE / INFTactive

Quantum Craft

Students are building a platform for campus operations.

ACE / INFTactive

Guardian Edge

Students are building a platform for air quality monitoring.

Builders roster
ACE / CMPNactive

Quantum Lens

Students are building a platform for disaster response.

Builders roster
ACE / CMPNactive

Crest Lens

Students are building a platform for student wellness.

Builders roster
ACE / CMPNactive

Astra Track

Students are building a platform for water conservation.

Builders roster
ACE / INFTactive

Trail Hub

Students are building a platform for air quality monitoring.

Builders roster
ACE / CMPNactive

Eco Pilot

Students are building a platform for water conservation.

Reviews Moderated (Panel Head)

Feedback Log

"Prism Guard checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

3,536

Feedback Log

"Trail Grid checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

6,855

Feedback Log

"Matrix Link checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

18,135

Feedback Log

"Lumen Path checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

10,661

Feedback Log

"Quantum Forge checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

2,687

Feedback Log

"Prism Nest checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

17,386

Feedback Log

"Astra Chain checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

7,184

Feedback Log

"Nexus Map checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

5,450

Feedback Log

"Summit Vault checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

14,563

Feedback Log

"Orion Grid checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

14,508

Feedback Log

"Quantum Forge checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

9,123

Feedback Log

"Campus Scale checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

3,141

Feedback Log

"Summit Grid checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

12,371

Feedback Log

"Campus Watch checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

4,737

Feedback Log

"Insight Hub checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

19,827

Feedback Log

"Quantum Pilot checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

13,485

Feedback Log

"Atlas Grid checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

17,920

Feedback Log

"Insight Vault checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

19,336

Looking for more evaluations?

Browse More Projects