ATHARVA_UNIVERSITY_NODE_34

Dr. Priya Mehta

Computer Engineering
Atharva College of Engineering
Designation:Assistant Professor

Projects Guided

ACE / INFTactive

Atlas Point

Students are building a platform for nutrition tracking.

Builders roster
ACE / INFTactive

Astra Desk

Students are building a platform for smart mobility.

Builders roster
ACE / CMPNactive

Medi Desk

Students are building a platform for skill discovery.

ACE / CMPNactive

Bridge Path

Students are building a platform for supply chain visibility.

ACE / CMPNactive

Horizon Route

Students are building a platform for agritech logistics.

ACE / INFTcompleted

Red dead redemption 3

the best game ever is taking too much time so we stepped in

ACE / CMPNactive

Summit Link

Students are building a platform for agritech logistics.

Builders roster
ACE / CMPNactive

Vector Track

Students are building a platform for disaster response.

ACE / INFTactive

Astra Nest

Students are building a platform for smart mobility.

ACE / CMPNactive

Pulse Map

Students are building a platform for water conservation.

ACE / INFTactive

Medi Chain

Students are building a platform for campus operations.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Delta Track checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

17,623

Feedback Log

"Matrix Scale checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

14,797

Feedback Log

"Prism Guard checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

13,382

Feedback Log

"Trail Path checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

11,809

Feedback Log

"Bridge Core checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

10,878

Feedback Log

"Summit Track checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

19,452

Feedback Log

"Guardian Pulse checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

8,783

Feedback Log

"Vector Wave checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

7,686

Feedback Log

"Motion Sphere checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

7,801

Feedback Log

"Crest Sphere checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

17,004

Feedback Log

"Astra Pulse checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

13,895

Looking for more evaluations?

Browse More Projects