ATHARVA_UNIVERSITY_NODE_34

Prof. Amit Kumar

Information Technology
Atharva College of Engineering
Designation:Associate Professor

Projects Guided

ACE / CMPNactive

Zenith Wave

Students are building a platform for energy monitoring.

ACE / INFTactive

Delta Scale

Students are building a platform for fraud detection.

Builders roster
ACE / CMPNactive

Eco Path

Students are building a platform for supply chain visibility.

ACE / INFTactive

Cloud Path

Students are building a platform for fraud detection.

ACE / INFTactive

Signal Edge

Students are building a platform for campus operations.

Builders roster
ACE / INFTactive

Pulse Frame

Students are building a platform for learning analytics.

ACE / CMPNactive

Vertex Spark

Students are building a platform for supply chain visibility.

Builders roster
ACE / CMPNactive

Nova Dock

Students are building a platform for student wellness.

ACE / INFTactive

Matrix Vault

Students are building a platform for fraud detection.

ACE / CMPNactive

Beacon Flow

Students are building a platform for energy monitoring.

ACE / CMPNactive

Bridge Track

Students are building a platform for agritech logistics.

ACE / INFTactive

Matrix Forge

Students are building a platform for campus operations.

Builders roster
ACE / INFTactive

Nimbus Sense

Students are building a platform for campus operations.

Builders roster
ACE / CMPNactive

Summit Sense

Students are building a platform for energy monitoring.

Reviews Moderated (Panel Head)

Feedback Log

"Sage Hub checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

19,739

Feedback Log

"Orbit Pilot checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

16,642

Feedback Log

"Signal Track checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

16,587

Feedback Log

"Matrix Path checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

18,517

Feedback Log

"Delta Nest checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

18,152

Feedback Log

"Nimbus Watch checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

3,570

Feedback Log

"Compass Shift checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

14,344

Feedback Log

"Campus Map checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

15,548

Feedback Log

"Summit Grid checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

19,360

Feedback Log

"Nova Guard checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

7,230

Feedback Log

"Zenith Map checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

7,947

Feedback Log

"Horizon Point checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

18,207

Feedback Log

"Beacon Grid checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

3,038

Feedback Log

"Vertex Sphere checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

12,253

Feedback Log

"Compass Pilot checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

15,322

Looking for more evaluations?

Browse More Projects