ATHARVA_UNIVERSITY_NODE_34

Prof. Neeraj Joshi

Information Technology
Atharva College of Engineering
Designation:Industry Mentor

Projects Guided

ACE / INFTactive

Campus Wave

Students are building a platform for digital health.

ACE / INFTactive

Zenith Link

Students are building a platform for smart mobility.

Builders roster
ACE / CMPNactive

Signal Track

Students are building a platform for disaster response.

ACE / CMPNactive

Medi Hub

Students are building a platform for supply chain visibility.

Builders roster
ACE / INFTactive

Prism Hub

Students are building a platform for learning analytics.

ACE / INFTactive

Insight Care

Students are building a platform for air quality monitoring.

Builders roster
ACE / INFTactive

Horizon Nest

Students are building a platform for campus operations.

Builders roster
ACE / INFTactive

Delta Nest

Students are building a platform for smart mobility.

Builders roster
ACE / CMPNactive

Beacon Shift

Students are building a platform for local commerce.

ACE / INFTactive

Origin Shift

Students are building a platform for nutrition tracking.

Reviews Moderated (Panel Head)

Feedback Log

"Prism Desk checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

980

Feedback Log

"Campus Works checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

888

Feedback Log

"Motion Forge checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

14,515

Feedback Log

"Insight Hub checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

5,198

Feedback Log

"Signal Map checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

15,580

Feedback Log

"Lumen Path checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

15,515

Feedback Log

"Atlas Wave checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

18,917

Feedback Log

"Orbit Forge checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

1,017

Feedback Log

"Horizon Link checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

14,825

Feedback Log

"Delta Scale checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

9,573

Feedback Log

"Guardian Point checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

14,067

Feedback Log

"Guardian Hub checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

5,736

Feedback Log

"Summit Chain checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

4,677

Feedback Log

"Matrix Pilot checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

10,656

Feedback Log

"Origin Sphere checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

2,598

Looking for more evaluations?

Browse More Projects