ATHARVA_UNIVERSITY_NODE_34

Prof. Amit Patil

Information Technology
Atharva College of Engineering
Designation:Department Coordinator

Projects Guided

ACE / CMPNactive

Nexus Point

Students are building a platform for student wellness.

ACE / CMPNactive

Delta Wave

Students are building a platform for supply chain visibility.

Builders roster
ACE / INFTactive

Eco Pulse

Students are building a platform for campus operations.

Builders roster
ACE / CMPNactive

Insight Hub

Students are building a platform for agritech logistics.

ACE / CMPNactive

Origin Care

Students are building a platform for water conservation.

Builders roster
ACE / INFTactive

Summit Map

Students are building a platform for digital health.

Builders roster
ACE / INFTactive

Signal Watch

Students are building a platform for campus operations.

Builders roster
ACE / CMPNactive

Delta Works

Students are building a platform for energy monitoring.

Reviews Moderated (Panel Head)

Feedback Log

"Pulse Sense checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

3,776

Feedback Log

"Nexus Pulse checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

4,784

Feedback Log

"Nexus Grid checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

15,498

Feedback Log

"Pulse Flow checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

11,847

Feedback Log

"Beacon Link checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

12,331

Feedback Log

"Cipher Vault checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

8,745

Feedback Log

"Matrix Loop checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

5,319

Feedback Log

"Summit Guard checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

12,604

Feedback Log

"Cipher Loop checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

9,433

Feedback Log

"Horizon Grid checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

7,234

Feedback Log

"Motion Watch checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

6,320

Feedback Log

"Matrix Sense checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

4,659

Looking for more evaluations?

Browse More Projects