ATHARVA_UNIVERSITY_NODE_34

Dr. Priya Patil

Computer Engineering
Atharva College of Engineering
Designation:Research Advisor

Projects Guided

ACE / INFTactive

Vertex Loop

Students are building a platform for digital health.

Builders roster
ACE / CMPNactive

Lumen Edge

Students are building a platform for student wellness.

ACE / INFTactive

Delta Edge

Students are building a platform for nutrition tracking.

Builders roster
ACE / CMPNactive

Vector Route

Students are building a platform for energy monitoring.

Builders roster
ACE / CMPNactive

Orbit Link

Students are building a platform for student wellness.

Builders roster
ACE / CMPNactive

Vertex Vault

Students are building a platform for disaster response.

ACE / INFTactive

Lumen Vault

Students are building a platform for urban mobility.

ACE / CMPNactive

Trail Grid

Students are building a platform for agritech logistics.

ACE / CMPNactive

Signal Grid

Students are building a platform for supply chain visibility.

Builders roster
ACE / CMPNactive

Astra Care

Students are building a platform for disaster response.

Builders roster
ACE / CMPNactive

Horizon Chain

Students are building a platform for water conservation.

Reviews Moderated (Panel Head)

Feedback Log

"Compass Grid checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

10

Feedback Log

"Signal Guard checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

13,083

Feedback Log

"Atlas Guard checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

13,073

Feedback Log

"Motion Lens checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

14,703

Feedback Log

"Vertex Point checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

15,963

Feedback Log

"Fusion Lens checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

14,864

Feedback Log

"Origin Care checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

17,043

Feedback Log

"Prism Watch checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

14,511

Feedback Log

"Eco Path checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

6,779

Feedback Log

"Lumen Point checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

9,965

Feedback Log

"Astra Loop checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

15,402

Feedback Log

"Horizon Sphere checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

3,315

Feedback Log

"Prism Pilot checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

9,598

Feedback Log

"Trail Watch checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

549

Looking for more evaluations?

Browse More Projects