ATHARVA_UNIVERSITY_NODE_34

Dr. Kavita Saxena

Computer Engineering
Atharva College of Engineering
Designation:Assistant Professor

Projects Guided

ACE / INFTactive

Nimbus Pulse

Students are building a platform for fraud detection.

ACE / CMPNactive

Flux Scale

Students are building a platform for agritech logistics.

ACE / INFTactive

Summit Craft

Students are building a platform for digital health.

ACE / CMPNactive

Campus Edge

Students are building a platform for agritech logistics.

ACE / INFTactive

Nimbus Edge

Students are building a platform for digital health.

Builders roster
ACE / CMPNactive

Guardian Spark

Students are building a platform for disaster response.

Builders roster
ACE / INFTactive

Compass Spark

Students are building a platform for air quality monitoring.

ACE / INFTactive

Trail Flow

Students are building a platform for urban mobility.

Builders roster
ACE / CMPNactive

Lumen Flow

Students are building a platform for agritech logistics.

ACE / INFTactive

Fusion Lens

Students are building a platform for smart mobility.

ACE / INFTactive

Sage Track

Students are building a platform for smart mobility.

Builders roster
ACE / INFTactive

Matrix Pilot

Students are building a platform for smart mobility.

Builders roster
ACE / CMPNactive

Atlas Sphere

Students are building a platform for local commerce.

Builders roster
ACE / CMPNactive

Lumen Sphere

Students are building a platform for disaster response.

Builders roster
ACE / INFTactive

Sage Works

Students are building a platform for air quality monitoring.

ACE / CMPNactive

Nova Pulse

Students are building a platform for local commerce.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Delta Scale checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

1,593

Prototype Screenshots

Prototype Visual 1Prototype Visual 2

Feedback Log

"Astra Path checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

1,592

Feedback Log

"Nimbus Forge checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

18,412

Feedback Log

"Compass Flow checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

11,936

Feedback Log

"Crest Forge checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

12,590

Feedback Log

"Guardian Grid checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

4,397

Feedback Log

"Orion Desk checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

12,324

Feedback Log

"Compass Flow checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

17,929

Feedback Log

"Nexus Flow checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

19,462

Feedback Log

"Nexus Hub checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,886

Feedback Log

"Atlas Point checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

10,578

Feedback Log

"Motion Desk checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

9,449

Feedback Log

"Campus Lens checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

9,918

Feedback Log

"Astra Track checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

5,889

Feedback Log

"Origin Wave checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

19,621

Feedback Log

"Crest Flow checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

1,493

Feedback Log

"Signal Grid checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

8,832

Feedback Log

"Insight Guard checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

6,428

Feedback Log

"Flux Lens checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

15,800

Feedback Log

"Sage Map checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

3,313

Feedback Log

"Matrix Lens checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

16,607

Feedback Log

"Delta Sense checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

5,660

Feedback Log

"Bridge Watch checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

398

Feedback Log

"Horizon Pilot checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

5,037

Looking for more evaluations?

Browse More Projects