ATHARVA_UNIVERSITY_NODE_34

Prof. Sameer Patil

Information Technology
Atharva College of Engineering
Designation:Industry Mentor

Projects Guided

ACE / CMPNactive

Nexus Path

Students are building a platform for energy monitoring.

Builders roster
ACE / CMPNactive

Zenith Route

Students are building a platform for supply chain visibility.

ACE / INFTactive

Signal Link

Students are building a platform for fraud detection.

ACE / INFTactive

Summit Pilot

Students are building a platform for smart mobility.

ACE / INFTactive

Lumen Care

Students are building a platform for smart mobility.

ACE / INFTactive

Quantum Map

Students are building a platform for campus operations.

Builders roster
ACE / INFTactive

Sage Forge

Students are building a platform for urban mobility.

Reviews Moderated (Panel Head)

Feedback Log

"Astra Desk checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

16,201

Feedback Log

"Vertex Forge checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

17,100

Feedback Log

"Trail Lens checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

13,681

Feedback Log

"Horizon Forge checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

386

Feedback Log

"Pulse Works checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

19,617

Feedback Log

"Signal Track checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

3,458

Feedback Log

"Medi Flow checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

6,251

Feedback Log

"Zenith Path checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

10,157

Feedback Log

"Summit Map checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

3,012

Feedback Log

"Trail Pulse checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

10,219

Feedback Log

"Horizon Lens checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

13,460

Feedback Log

"Cipher Desk checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

255

Feedback Log

"Zenith Point checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

3,110

Feedback Log

"Insight Point checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

14,473

Feedback Log

"Signal Chain checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

13,184

Feedback Log

"Lumen Core checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

19,010

Feedback Log

"Nova Pulse checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

1,589

Feedback Log

"Medi Wave checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

18,241

Feedback Log

"Campus Shift checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

10,187

Feedback Log

"Medi Map checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

13,385

Feedback Log

"Prism Care checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

1,342

Looking for more evaluations?

Browse More Projects