ATHARVA_UNIVERSITY_NODE_34

Dr. Priya Joshi

Computer Engineering
Atharva College of Engineering
Designation:Professor

Projects Guided

ACE / INFTactive

Horizon Scale

Students are building a platform for smart mobility.

Builders roster
ACE / INFTactive

Vector Core

Students are building a platform for nutrition tracking.

ACE / INFTactive

Flux Spark

Students are building a platform for digital health.

ACE / CMPNactive

Medi Dock

Students are building a platform for energy monitoring.

ACE / CMPNactive

Cloud Link

Students are building a platform for skill discovery.

ACE / CMPNactive

Medi Flow

Students are building a platform for agritech logistics.

ACE / CMPNactive

Horizon Track

Students are building a platform for skill discovery.

ACE / CMPNactive

Pulse Chain

Students are building a platform for disaster response.

ACE / INFTactive

Insight Chain

Students are building a platform for nutrition tracking.

Reviews Moderated (Panel Head)

Feedback Log

"Sage Loop checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

10,305

Feedback Log

"Medi Lens checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

15,829

Feedback Log

"Nova Link checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

18,174

Feedback Log

"Insight Forge checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

16,262

Feedback Log

"Signal Path checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

15,395

Feedback Log

"Orbit Wave checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

7,551

Feedback Log

"Delta Desk checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

5,450

Feedback Log

"Prism Wave checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

2,952

Feedback Log

"Orion Shift checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

12,359

Feedback Log

"Trail Wave checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

16,251

Feedback Log

"Trail Flow checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,718
Friday #19 Details

September 11, 2026

Pulse Map

Feedback Log

"Pulse Map checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

2,619

Feedback Log

"Prism Link checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

10,989

Feedback Log

"Insight Flow checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

797

Feedback Log

"Beacon Sense checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

1,440

Feedback Log

"Beacon Nest checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

13,104

Feedback Log

"Origin Point checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

14,952

Feedback Log

"Vertex Scale checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

3,731

Feedback Log

"Prism Flow checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

13,108

Feedback Log

"Horizon Watch checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

17,260

Looking for more evaluations?

Browse More Projects