ATHARVA_UNIVERSITY_NODE_34

Dr. Kavita Nair

Computer Engineering
Atharva College of Engineering
Designation:Research Advisor

Projects Guided

ACE / CMPNactive

Harbor Loop

Students are building a platform for local commerce.

ACE / CMPNactive

Lumen Core

Students are building a platform for disaster response.

ACE / CMPNactive

Campus Desk

Students are building a platform for energy monitoring.

ACE / INFTactive

Nimbus Desk

Students are building a platform for nutrition tracking.

ACE / INFTactive

Zenith Desk

Students are building a platform for fraud detection.

ACE / INFTactive

Lumen Route

Students are building a platform for digital health.

ACE / INFTactive

Campus Vault

Students are building a platform for learning analytics.

Builders roster
ACE / CMPNactive

Summit Flow

Students are building a platform for water conservation.

Builders roster
ACE / CMPNactive

Bridge Grid

Students are building a platform for energy monitoring.

ACE / CMPNactive

Nexus Grid

Students are building a platform for skill discovery.

ACE / INFTactive

Lumen Pilot

Students are building a platform for learning analytics.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Campus Wave checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

12,238

Feedback Log

"Guardian Nest checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

16,360

Feedback Log

"Fusion Sense checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

17,687

Feedback Log

"Zenith Chain checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

19,678

Feedback Log

"Atlas Care checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

2,859

Feedback Log

"Orion Guard checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

19,507

Feedback Log

"Orion Chain checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

4,865

Feedback Log

"Orion Vault checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

2,321

Feedback Log

"Insight Pilot checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

12,674

Feedback Log

"Nova Vault checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

6,730

Feedback Log

"Cloud Pulse checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

5,153

Feedback Log

"Quantum Watch checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

12,495

Feedback Log

"Origin Sense checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

15,191

Feedback Log

"Campus Core checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

1,628

Feedback Log

"Medi Scale checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

13,816

Feedback Log

"Vertex Guard checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

11,300

Looking for more evaluations?

Browse More Projects