ATHARVA_UNIVERSITY_NODE_34

Prof. Neeraj Nair

Information Technology
Atharva College of Engineering
Designation:Industry Mentor

Projects Guided

ACE / INFTactive

Compass Path

Students are building a platform for campus operations.

ACE / CMPNactive

Orion Vault

Students are building a platform for water conservation.

ACE / INFTactive

Pulse Sphere

Students are building a platform for urban mobility.

Builders roster
ACE / INFTactive

Quantum Chain

Students are building a platform for fraud detection.

Builders roster
ACE / INFTactive

Vector Shift

Students are building a platform for fraud detection.

Reviews Moderated (Panel Head)

Feedback Log

"Fusion Desk checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

16,196

Feedback Log

"Medi Works checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

971

Feedback Log

"Vertex Sense checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

673

Feedback Log

"Beacon Sense checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

4,982

Feedback Log

"Trail Core checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

13,349

Feedback Log

"Orion Care checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

1,560

Feedback Log

"Guardian Core checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

18,277

Feedback Log

"Pulse Scale checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

13,089

Feedback Log

"Orbit Path checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

11,390

Feedback Log

"Atlas Pulse checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,214

Feedback Log

"Orbit Sense checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

3,582

Feedback Log

"Horizon Track checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

5,537

Feedback Log

"Campus Hub checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

4,652

Feedback Log

"Lumen Guard checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

11,694

Feedback Log

"Astra Shift checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

4,351

Feedback Log

"Delta Wave checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

14,466

Feedback Log

"Pulse Pilot checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

8,670

Feedback Log

"Insight Shift checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

16,970

Feedback Log

"Sage Works checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

7,523

Feedback Log

"Nimbus Grid checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

14,574

Feedback Log

"Harbor Guard checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

8,885

Feedback Log

"Fusion Guard checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

18,884

Looking for more evaluations?

Browse More Projects