ATHARVA_UNIVERSITY_NODE_34

Dr. Ramesh Nair

Computer Engineering
Atharva College of Engineering
Designation:Professor

Projects Guided

ACE / CMPNactive

Guardian Path

Students are building a platform for agritech logistics.

Builders roster
ACE / CMPNactive

Cloud Desk

Students are building a platform for water conservation.

ACE / CMPNactive

Vector Vault

Students are building a platform for water conservation.

Builders roster
ACE / CMPNactive

Lumen Lens

Students are building a platform for water conservation.

Builders roster
ACE / INFTactive

Flux Track

Students are building a platform for fraud detection.

Builders roster
ACE / INFTactive

Zenith Sphere

Students are building a platform for urban mobility.

ACE / CMPNactive

Flux Nest

Students are building a platform for disaster response.

Builders roster
ACE / INFTactive

Nexus Watch

Students are building a platform for fraud detection.

ACE / INFTactive

Lumen Forge

Students are building a platform for digital health.

Builders roster
ACE / CMPNactive

Harbor Shift

Students are building a platform for disaster response.

Builders roster
ACE / CMPNactive

Compass Shift

Students are building a platform for supply chain visibility.

Builders roster
ACE / CMPNactive

Trail Works

Students are building a platform for energy monitoring.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Campus Pilot checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

15,096

Feedback Log

"Nova Sense checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

4,570

Feedback Log

"Guardian Map checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

12,698

Feedback Log

"Vector Nest checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

19,180

Feedback Log

"Eco Guard checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

5,963

Feedback Log

"Vector Desk checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

7,725

Feedback Log

"Lumen Guard checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

17,462

Feedback Log

"Bridge Shift checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

10,315

Feedback Log

"Pulse Forge checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

1,955

Feedback Log

"Nimbus Sense checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

11,518

Looking for more evaluations?

Browse More Projects