ATHARVA_UNIVERSITY_NODE_34

Prof. Amit Shah

Information Technology
Atharva College of Engineering
Designation:Industry Mentor

Projects Guided

ACE / INFTactive

Signal Pulse

Students are building a platform for air quality monitoring.

ACE / CMPNactive

Astra Point

Students are building a platform for water conservation.

ACE / INFTactive

Bridge Core

Students are building a platform for air quality monitoring.

Builders roster
ACE / INFTactive

Cloud Craft

Students are building a platform for air quality monitoring.

Builders roster
ACE / INFTactive

Nexus Edge

Students are building a platform for fraud detection.

ACE / CMPNactive

Fusion Route

Students are building a platform for agritech logistics.

ACE / INFTactive

Sage Pilot

Students are building a platform for nutrition tracking.

Builders roster
ACE / INFTactive

Signal Nest

Students are building a platform for digital health.

Reviews Moderated (Panel Head)

Feedback Log

"Vertex Wave checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

866

Feedback Log

"Prism Map checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

11,619

Feedback Log

"Harbor Loop checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

8,117

Feedback Log

"Fusion Loop checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

6,366

Feedback Log

"Cloud Guard checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

3,530

Feedback Log

"Fusion Flow checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

1,727

Feedback Log

"Harbor Chain checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

265

Feedback Log

"Campus Care checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

16,687

Feedback Log

"Nexus Pilot checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

12,936

Feedback Log

"Quantum Shift checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

7,115

Feedback Log

"Signal Sense checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

19,270

Feedback Log

"Vector Care checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

3,797

Feedback Log

"Nova Scale checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

3,194

Feedback Log

"Nexus Lens checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

2,293

Feedback Log

"Trail Grid checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

8,804

Looking for more evaluations?

Browse More Projects