ATHARVA_UNIVERSITY_NODE_34

Prof. Amit Mehta

Information Technology
Atharva College of Engineering
Designation:Industry Mentor

Projects Guided

ACE / CMPNactive

Vertex Guard

Students are building a platform for skill discovery.

Builders roster
ACE / INFTactive

Orion Core

Students are building a platform for nutrition tracking.

ACE / CMPNactive

Delta Route

Students are building a platform for student wellness.

ACE / INFTactive

Vector Hub

Students are building a platform for smart mobility.

ACE / INFTactive

Harbor Map

Students are building a platform for fraud detection.

Builders roster
ACE / INFTactive

Atlas Forge

Students are building a platform for fraud detection.

ACE / INFTactive

Orbit Chain

Students are building a platform for nutrition tracking.

ACE / INFTactive

Atlas Chain

Students are building a platform for air quality monitoring.

Builders roster
ACE / INFTactive

Lumen Chain

Students are building a platform for campus operations.

Builders roster
ACE / INFTactive

Summit Works

Students are building a platform for fraud detection.

Reviews Moderated (Panel Head)

Feedback Log

"Signal Shift checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

14,517

Feedback Log

"Atlas Pulse checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

5,231

Feedback Log

"Quantum Path checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,565

Feedback Log

"Lumen Pulse checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

17,132

Feedback Log

"Vector Lens checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

19,535

Feedback Log

"Fusion Sense checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

209

Feedback Log

"Trail Map checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

5,758

Feedback Log

"Atlas Scale checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

5,487

Feedback Log

"Harbor Pulse checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

9,030

Feedback Log

"Cloud Pulse checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

1,116

Feedback Log

"Cipher Guard checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

5,030
Friday #19 Details

September 11, 2026

Flux Core

Feedback Log

"Flux Core checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

9,517

Feedback Log

"Trail Sense checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

14,613

Feedback Log

"Quantum Forge checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

9,750

Feedback Log

"Delta Map checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

1,136

Feedback Log

"Compass Hub checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

17,567

Looking for more evaluations?

Browse More Projects