ATHARVA_UNIVERSITY_NODE_34

Dr. Kavita Reddy

Computer Engineering
Atharva College of Engineering
Designation:Assistant Professor

Projects Guided

ACE / CMPNactive

Orbit Scale

Students are building a platform for energy monitoring.

ACE / INFTactive

Insight Path

Students are building a platform for air quality monitoring.

Builders roster
ACE / INFTactive

Origin Lens

Students are building a platform for campus operations.

Builders roster
ACE / CMPNactive

Astra Pilot

Students are building a platform for supply chain visibility.

Reviews Moderated (Panel Head)

Feedback Log

"Insight Link checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

5,312

Feedback Log

"Vector Guard checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

8,014

Feedback Log

"Cloud Path checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

10,084

Feedback Log

"Sage Grid checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

16,453

Feedback Log

"Astra Craft checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,047

Feedback Log

"Matrix Chain checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

4,603

Feedback Log

"Orion Sense checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

2,584

Feedback Log

"Quantum Core checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

9,747

Feedback Log

"Delta Wave checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

13,960

Feedback Log

"Cloud Core checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

10,303

Feedback Log

"Harbor Pilot checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

10,652

Feedback Log

"Vertex Nest checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

15,185

Feedback Log

"Astra Point checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

14,045

Feedback Log

"Zenith Watch checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

2,406

Feedback Log

"Nova Flow checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

9,018

Feedback Log

"Atlas Pilot checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

9,110

Feedback Log

"Campus Link checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

2,476

Feedback Log

"Fusion Chain checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

86

Looking for more evaluations?

Browse More Projects