ATHARVA_UNIVERSITY_NODE_34

Prof. Sunita Nair

Information Technology
Atharva College of Engineering
Designation:Associate Professor

Projects Guided

ACE / CMPNactive

Quantum Dock

Students are building a platform for water conservation.

Builders roster
ACE / CMPNactive

Zenith Grid

Students are building a platform for student wellness.

ACE / INFTactive

Orion Hub

Students are building a platform for smart mobility.

ACE / CMPNactive

Summit Hub

Students are building a platform for disaster response.

ACE / INFTactive

Vertex Nest

Students are building a platform for urban mobility.

Builders roster
ACE / INFTactive

Campus Map

Students are building a platform for urban mobility.

Reviews Moderated (Panel Head)

Feedback Log

"Harbor Scale checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

3,406

Feedback Log

"Origin Pulse checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

8,464

Feedback Log

"Sage Shift checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

2,943

Feedback Log

"Insight Watch checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

18,263

Feedback Log

"Astra Guard checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

14,215

Feedback Log

"Delta Guard checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

15,933

Feedback Log

"Compass Vault checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

2,347

Feedback Log

"Summit Point checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

3,821

Feedback Log

"Bridge Loop checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

10,433

Feedback Log

"Harbor Wave checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

13,301

Feedback Log

"Lumen Forge checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

12,200

Feedback Log

"Insight Nest checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

4,225

Feedback Log

"Zenith Vault checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

2,444

Feedback Log

"Prism Map checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

19,152

Feedback Log

"Vector Watch checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

1,648

Feedback Log

"Orbit Link checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

19,745

Looking for more evaluations?

Browse More Projects