ATHARVA_UNIVERSITY_NODE_34

Dr. Seema Kumar

Computer Engineering
Atharva College of Engineering
Designation:Assistant Professor

Projects Guided

ACE / CMPNactive

Motion Pulse

Students are building a platform for student wellness.

Builders roster
ACE / INFTactive

Lumen Wave

Students are building a platform for learning analytics.

Builders roster
ACE / INFTactive

Nova Route

Students are building a platform for smart mobility.

ACE / CMPNactive

Bridge Care

Students are building a platform for supply chain visibility.

ACE / CMPNactive

Nexus Care

Students are building a platform for energy monitoring.

ACE / CMPNactive

Signal Map

Students are building a platform for local commerce.

Builders roster
ACE / INFTactive

Fusion Watch

Students are building a platform for urban mobility.

ACE / CMPNactive

Nexus Works

Students are building a platform for disaster response.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Cloud Grid checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

375

Feedback Log

"Signal Loop checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

14,738

Feedback Log

"Lumen Sphere checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

14,204

Feedback Log

"Zenith Link checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

16,024

Feedback Log

"Crest Lens checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

2,567

Feedback Log

"Prism Works checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

5,121

Feedback Log

"Pulse Craft checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

489

Feedback Log

"Eco Path checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

14,654

Feedback Log

"Signal Desk checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

1,292

Feedback Log

"Harbor Works checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

4,077

Feedback Log

"Beacon Sense checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

17,700

Feedback Log

"Bridge Chain checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

3,679

Feedback Log

"Vertex Sense checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

5,892

Feedback Log

"Nexus Core checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

10,852

Feedback Log

"Astra Core checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

15,002

Feedback Log

"Guardian Sense checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

9,163

Feedback Log

"Crest Flow checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

7,590

Feedback Log

"Delta Forge checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

11,437

Feedback Log

"Vertex Pilot checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

18,583

Feedback Log

"Matrix Vault checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

15,065

Feedback Log

"Insight Vault checkpoint 3: finished the first hardware/software sync and captured demo evidence."

Approved Funding

16,753

Looking for more evaluations?

Browse More Projects