ATHARVA_UNIVERSITY_NODE_34

Prof. Sameer Joshi

Information Technology
Atharva College of Engineering
Designation:Department Coordinator

Projects Guided

ACE / INFTactive

Vertex Core

Students are building a platform for campus operations.

ACE / INFTactive

Nimbus Loop

Students are building a platform for learning analytics.

ACE / INFTactive

Matrix Route

Students are building a platform for campus operations.

Builders roster
ACE / CMPNactive

Zenith Vault

Students are building a platform for skill discovery.

Builders roster
ACE / INFTactive

Bridge Watch

Students are building a platform for smart mobility.

Reviews Moderated (Panel Head)

Feedback Log

"Prism Lens checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,081

Feedback Log

"Matrix Vault checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

5,972

Feedback Log

"Guardian Scale checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

6,939

Feedback Log

"Flux Shift checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

11,277

Feedback Log

"Nexus Vault checkpoint 3: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

5,555

Feedback Log

"Eco Watch checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

17,300

Feedback Log

"Cipher Grid checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

1,290

Feedback Log

"Fusion Wave checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

5,194

Feedback Log

"Bridge Point checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

19,809

Feedback Log

"Zenith Lens checkpoint 3: tightened the data model and started performance profiling for the next sprint."

Approved Funding

8,440

Feedback Log

"Fusion Sphere checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

7,689

Feedback Log

"Fusion Map checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

154

Feedback Log

"Motion Nest checkpoint 2: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

10,434

Looking for more evaluations?

Browse More Projects