ATHARVA_UNIVERSITY_NODE_34

Prof. Amit Iyer

Information Technology
Atharva College of Engineering
Designation:Industry Mentor

Projects Guided

ACE / CMPNactive

Nimbus Wave

Students are building a platform for disaster response.

Builders roster
ACE / CMPNactive

Nova Core

Students are building a platform for water conservation.

ACE / CMPNactive

Insight Core

Students are building a platform for water conservation.

ACE / INFTactive

Cipher Core

Students are building a platform for fraud detection.

Builders roster
ACE / INFTactive

Motion Path

Students are building a platform for fraud detection.

Builders roster
ACE / INFTactive

Flux Route

Students are building a platform for nutrition tracking.

Builders roster
ACE / INFTactive

Compass Route

Students are building a platform for fraud detection.

Builders roster
ACE / CMPNactive

Nimbus Vault

Students are building a platform for agritech logistics.

ACE / INFTactive

Signal Flow

Students are building a platform for air quality monitoring.

Builders roster
ACE / CMPNactive

Horizon Grid

Students are building a platform for disaster response.

Builders roster
ACE / CMPNactive

Eco Map

Students are building a platform for disaster response.

ACE / CMPNactive

Campus Shift

Students are building a platform for supply chain visibility.

Builders roster

Reviews Moderated (Panel Head)

Feedback Log

"Delta Works checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

223

Feedback Log

"Crest Wave checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

17,261

Feedback Log

"Orbit Care checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

16,946

Feedback Log

"Eco Sense checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,753

Feedback Log

"Pulse Desk checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

5,610

Feedback Log

"Lumen Care checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

1,126

Feedback Log

"Delta Care checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

1,454

Feedback Log

"Bridge Hub checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

19,146

Feedback Log

"Nexus Point checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

4,333

Feedback Log

"Astra Shift checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

13,039

Feedback Log

"Guardian Link checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

19,745

Feedback Log

"Bridge Link checkpoint 3: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

17,824

Feedback Log

"Nimbus Lens checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

18,700

Feedback Log

"Signal Scale checkpoint 1: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

7,852

Feedback Log

"Prism Grid checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

7,834

Feedback Log

"Bridge Sphere checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

14,559

Feedback Log

"Prism Track checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

16,019

Feedback Log

"Insight Guard checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

12,894

Looking for more evaluations?

Browse More Projects