ATHARVA_UNIVERSITY_NODE_34

Dr. Seema Deshmukh

Computer Engineering
Atharva College of Engineering
Designation:Assistant Professor

Projects Guided

ACE / INFTactive

Nimbus Core

Students are building a platform for smart mobility.

ACE / INFTactive

Bridge Loop

Students are building a platform for fraud detection.

Builders roster
ACE / CMPNactive

Compass Loop

Students are building a platform for student wellness.

Builders roster
ACE / INFTactive

Bridge Desk

Students are building a platform for learning analytics.

ACE / INFTactive

Delta Desk

Students are building a platform for smart mobility.

ACE / CMPNactive

Origin Craft

Students are building a platform for supply chain visibility.

Builders roster
ACE / INFTactive

Zenith Edge

Students are building a platform for air quality monitoring.

ACE / CMPNactive

Matrix Frame

Students are building a platform for energy monitoring.

ACE / CMPNactive

Cipher Spark

Students are building a platform for skill discovery.

Builders roster
ACE / INFTactive

Beacon Vault

Students are building a platform for campus operations.

Builders roster
ACE / CMPNactive

Signal Vault

Students are building a platform for water conservation.

ACE / CMPNactive

Cipher Track

Students are building a platform for energy monitoring.

Builders roster
ACE / CMPNactive

Insight Nest

Students are building a platform for supply chain visibility.

ACE / INFTactive

Matrix Map

Students are building a platform for digital health.

ACE / CMPNactive

Cipher Works

Students are building a platform for student wellness.

Reviews Moderated (Panel Head)

Feedback Log

"Pulse Lens checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

19,577

Feedback Log

"Pulse Track checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

5,006

Feedback Log

"Trail Shift checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

9,813

Feedback Log

"Insight Desk checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

17,474

Feedback Log

"Delta Map checkpoint 2: tightened the data model and started performance profiling for the next sprint."

Approved Funding

17,505

Feedback Log

"Lumen Pilot checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

13,243

Feedback Log

"Prism Pulse checkpoint 1: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

18,371

Feedback Log

"Signal Map checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

17,989

Feedback Log

"Insight Watch checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

16,710

Feedback Log

"Harbor Point checkpoint 1: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

4,050

Feedback Log

"Origin Works checkpoint 1: tightened the data model and started performance profiling for the next sprint."

Approved Funding

11,527

Feedback Log

"Nexus Shift checkpoint 2: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

9,695

Feedback Log

"Origin Shift checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

3,606

Feedback Log

"Nexus Watch checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

2,491

Feedback Log

"Sage Core checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

5,423

Feedback Log

"Orion Track checkpoint 2: finished the first hardware/software sync and captured demo evidence."

Approved Funding

8,389

Feedback Log

"Orion Scale checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

5,098

Feedback Log

"Prism Forge checkpoint 1: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

6,308

Feedback Log

"Beacon Shift checkpoint 2: improved the UI polish and resolved a set of edge-case defects."

Approved Funding

3,311

Feedback Log

"Trail Chain checkpoint 3: validated the core user flow and confirmed the first prototype on staging."

Approved Funding

16,670

Feedback Log

"Delta Vault checkpoint 1: finished the first hardware/software sync and captured demo evidence."

Approved Funding

16,316

Feedback Log

"Orion Grid checkpoint 2: prepared a clean demo handoff and documented the open follow-up tasks."

Approved Funding

11,968

Feedback Log

"Vector Pilot checkpoint 3: completed the backend integration and reviewed the primary workflow with mentors."

Approved Funding

17,403

Looking for more evaluations?

Browse More Projects